• ROBO 2.0

    ABOUT:

    The task for line following robots is to follow the track as fast as possible. Track consists of a black line on a white field.

    Date: 20th Feb, 2020

    No. of Participants per group: 03

    INSTRUCTIONS:

    1. The robot must be autonomous.

    2. The maximum dimension of the robot is 25cm x 25cm x 25cm.

    3. It is forbidden to use higher voltage than 24 V in the robot.

    4. The robot must not damage the field or endanger the spectators in any way.

    5. The robot must always cover the line once it follows it, otherwise the race is considered to be failed.

    6. The robot must use only batteries or cells.

    7. The 15 mm wide line has been printed on the field with black colour.

    8. Robot should complete the track as fast as possible.